Equipment upgrade

一、設備翻新及改作業:

  1. Assist customers in the evaluation plan for extending the service life of old equipment.
  2. Conduct price evaluation for the plan required by the customer.
  3. Evaluate the feasibility of adding customer-required devices to existing equipment.

2. Case description:

Homework items:

  1. The control interface is refurbished.
  2. Vacuum Pump maintenance.
  3. The evaporation pot is modified into a public transformation type.
  4. Add three groups of system control and up-and-down revision mechanisms.
  5. Add SECS/GEM system.